Edward Kahaya holds a Bachelor's Degree in Electrical Engineering and has spent eleven years designing and installing biogas systems, biodigesters, sanitation infrastructure and alternative energy systems.
His work began in Uganda in 2015 with the Belgian Technical Cooperation, now Enabel, on a biogas system of around 120 cubic metres at Kaliro Technical Institute. It continued with a system of around 160 cubic metres at Abilonino Instructors College in 2016 and septic conversion and biogas projects with Uganda's Ministry of Energy and Mineral Development, including work at Kabojja Preparatory and Nyakasura Secondary School.
His largest installation to date is around 300 cubic metres of gas. Since November 2022 he has led biodigester and generator conversion work in Malawi.